Main Hall refurbishment
Thursday 07 September 2023 | By System AdminWe are thrilled to reveal that phase one of our stunning Main Hall refurbishment is now complete! Over the summer, we have:
- Overhauled the hall flooring; the existing hardwood floor was sanded and given a new lacquer seal, producing a new, lighter, timeless finish.
- New staging curtains; the enormous 4m x 6m curtains and pelmet which frame the stage were replaced with beautiful forest green drapes.
- New blackout curtains; we retained the elements needed to create a professional performance space by renewing the blackout curtains throughout the hall.
- Painting and decorating; the entire hall and balcony now features a warm and inviting colour scheme.
- Beautiful new entrance and exit doors were also installed to complement our new look.
Phase two will include a full refurbishment of the Main Hall balcony. The bright carpet and cinema-style seating, while comfortable, are a little outdated to say the least, and we have hopes to bring all of this in line with the rest of the space’s new look.
Thank you once again for helping us to raise funds for this project through various PTA activities. We cannot wait to welcome you to our beautiful Main Hall through a number of special events this term.